• Haul off Machine/Traction Machine/Pulling Machine for Pipe Production Line
  • Haul off Machine/Traction Machine/Pulling Machine for Pipe Production Line
  • Haul off Machine/Traction Machine/Pulling Machine for Pipe Production Line
  • Haul off Machine/Traction Machine/Pulling Machine for Pipe Production Line
  • Haul off Machine/Traction Machine/Pulling Machine for Pipe Production Line
  • Haul off Machine/Traction Machine/Pulling Machine for Pipe Production Line

Haul off Machine/Traction Machine/Pulling Machine for Pipe Production Line

Product Type: PVC Pipe
Screw No.: No Screw
Automation: Automatic
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Haul off Machine/Traction Machine/Pulling Machine for Pipe Production Line pictures & photos
Haul off Machine/Traction Machine/Pulling Machine for Pipe Production Line
US $1,000-10,000 / Set
Min. Order: 1 Set
Diamond Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
YS110
Computerized
Non-Computerized
Certification
CE, ISO9001:2008
Customized
Customized
Condition
New
Transport Package
Standard Shipping Package
Specification
YS110
Trademark
YUSHENG
Origin
China
HS Code
84778000
Production Capacity
20sets/Month

Packaging & Delivery

Package Size
350.00cm * 150.00cm * 180.00cm
Package Gross Weight
1500.000kg

Product Description

Haul off Machine/Traction Machine/Pulling Machine for Pipe Production Line

Main Performance Characteristic:
1. Adopting twin-claw traction, with large scope of application.
2. Using stepless speed regulation, a large speed regulation range.
3. Electrical traction, constant clamping force, traction speed equally.
4. Low noise.
5. Compact structure, elegant appearance.
Technical Parameter:
Model Pipe range(mm) Quantity Transmit type Motor power(kw) Max pulling force(N) Holding length(mm) Line speed(m/min) Dimension(mm) Central height(mm)
PDQY32/4 Φ16-Φ32 4×2 Belt 4×0.4 3000 800 1.2-15 2300×1200×1600 1000-1050
PDQY63/2 Φ16-Φ63 2×2 Belt 2×1.1 5000 1000 1.2-24 1500×1300×1700 1000-1050
LDQY160 Φ20-Φ160 3 claw 3×1.35 20000 1500 0.8-20 3600×1540×1900 1000-1050
LDQY250 Φ50-Φ250 4 claw 4×1.35 30000 1500 0.3-10 3600×1540×1900 1000-1050
LDQY315 Φ75-Φ315 4 claw 4×1.35 35000 2000 0.15-3 3600×1620×1900 1000-1050
LDQY450 Φ90-Φ450 4 claw 4×1.35 40000 2000 0.15-4 4400×2100×2100 1100-1150
LDQY630 Φ160-Φ630 6 claw 6×1.35 60000 2000 0.1-3 4500×2300×2300 1100-1150
LDQY800 Φ315-Φ800 8 claw 8×1.35 80000 2000 0.08-2 4500×2740×2570 1200-1250

Haul off Machine/Traction Machine/Pulling Machine for Pipe Production Line

AFTER-SALE SEVICE&TECHOLIGY SUPPORT:

INSTALLING FOR FREE
1. Warranty time: One year guaranteed for quality, product whole life service any damage except the wrong operation during warranty. Period is repaired freely, But the travel and hotel expenses should be count on buyer.
2. Commissioning services: The product's installation and commissioning at the demand side, our engineers will not leave there until get your agreement.
3. Traning Services: Our engineers will train your staff in your factory or video to operate it during the period of installation and commissioning, and they will not leave there until your staff can operate it properly and normally.
4. Manintenance Services: Any malfunction happened, Once you inquiry us, We will reply you within 24 hours.
5. The File: The manual specification, report of the material which used to the equipment and other documents video related to GMP authentication information will be provided by us.
 


 WHY CHOOSE YUSHENG? 
(1) we have experiences in this field for 11 years.
(2) we have our production bases in China, which shows our machine's production power .
(3) we have strond technical teams and cooperate with China scientific institution to develop, improve and test our machine 
(4) we have perfect service system: Our boss is devoting himself to after-sale service 
 
We will provide the Feasibility Analysis Report for the plastic machine project. 
We will provide the model design for the plastic machine plant and electric power accounting for the facilities. 
We will provide the model selection and technical parameter for our plastic machine. 
We will provide plastic formular according to the product requirements. 
We will provide technique training for operator. 
We will provide solution for the practical problem during the production. 
We will install and test the plastic machineand teach customer's workers how to operate in customers' factory. 

Send your message to this supplier

*From:
*To:
avatar Mr. Joe Zhou
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now